Gore Road Bridge

Sheet pile installation of the old bridge abutment for a new roadway and bridge system.

Location: Bolton, Ontario

 

PROJECT INFORMATION

Key waterways and fish spawning areas needed to be protected. The work area was also required to be watertight. Afterwards, the piles were retrieved to avoid damage and ecological interference with a nearby river.

Interested in working with our team? Feel free to contact us.